It’s been a
busy week here at the glorified shed – things have been happening that are
actually noticeable!
So far much
of the completed work had been ‘behind the scenes’ so to speak, with
underground drainage, removal of old pipework, rerouting of some electrics etc,
but now there are changes for all to see.
Progress
has certainly been made with regard to transforming the former workshop office
into a bathroom. In recent weeks Mr H has been insulating the walls, putting up
plasterboard and laying a level floor. Now the plumber has been in and put all
the pipework and drainage in place for the washbasin, shower, toilet and bath.
It’s now clear where each will be and it won’t be too long before they’re
actually in place! We’re frantically ordering and buying all the paraphernalia
needed for the finished, much anticipated, bathroom.
There's still much to be done in the living/kitchen area! |
And as if
this wasn’t enough, we’re also in the process of a having a new front door
fitted. Not the sorry excuse for one that is peeling and cracking and is still
bearing a sign marked “Entrance”, harking back to its workshop days. We’ve
chosen a good solid door, with a small ornamental glass section, sporting
antique-style fittings, and have even selected the paint colour in readiness.
However, the job is far from straightforward, as the whole surround and frame
has to be replaced first.
But once
the bathroom and door are both complete, we’ll have our first proper taste of
how our home may finally look, which is quite exciting!
Our
thoughts are already turning to the next job on the list – insulating and
plasterboarding the walls and ceiling of the main room, which is to be an open
plan arrangement comprising kitchen, lounge area, dining area, home office
space and hobby/crafting area. Hopefully we’ll see the addition of a wood-burning stove
before the onset of winter too!
These are
exciting times here at the glorified shed!