Saturday 27 June 2015

We’re Making Progress!


It’s been a busy week here at the glorified shed – things have been happening that are actually noticeable!

So far much of the completed work had been ‘behind the scenes’ so to speak, with underground drainage, removal of old pipework, rerouting of some electrics etc, but now there are changes for all to see.

Progress has certainly been made with regard to transforming the former workshop office into a bathroom. In recent weeks Mr H has been insulating the walls, putting up plasterboard and laying a level floor. Now the plumber has been in and put all the pipework and drainage in place for the washbasin, shower, toilet and bath. It’s now clear where each will be and it won’t be too long before they’re actually in place! We’re frantically ordering and buying all the paraphernalia needed for the finished, much anticipated, bathroom.

There's still much to be done in the living/kitchen area!
And as if this wasn’t enough, we’re also in the process of a having a new front door fitted. Not the sorry excuse for one that is peeling and cracking and is still bearing a sign marked “Entrance”, harking back to its workshop days. We’ve chosen a good solid door, with a small ornamental glass section, sporting antique-style fittings, and have even selected the paint colour in readiness. However, the job is far from straightforward, as the whole surround and frame has to be replaced first.

But once the bathroom and door are both complete, we’ll have our first proper taste of how our home may finally look, which is quite exciting!

Our thoughts are already turning to the next job on the list – insulating and plasterboarding the walls and ceiling of the main room, which is to be an open plan arrangement comprising kitchen, lounge area, dining area, home office space and hobby/crafting area. Hopefully we’ll see the addition of a wood-burning stove before the onset of winter too!

These are exciting times here at the glorified shed!

No comments:

Post a Comment